Railroad Crossing Diamond Replacement

This project was managed from unloading the material from the rail cars, assembling, removing the existing crossing diamond and installation

Railroad Switch Install

Inside switch design

The switch was completely destroyed in a derailment and removed to restore service. The carrier ordered a new switch in accordance with their standard. It was larger than the existing switches on the lead. The company they initially hired said it couldn’t be installed due to the size and left the carrier no options.

We designed the switch to fit inside the lead restoring access to the west end of their track that had been out of service for over a year.


2 Switches installed

Customer wanted 2 switches installed as an upgrade. We installed both switches including panes in one maintenance window

#24 Fully Assembled Switch Installed

What Is Included In All Projects:

Initial Consultation

Custom Gantt Chart

Dedicated Project Manager

Post-Implementation Review